Orion US completed an office buildout for a multinational company for their branch in Concord and Kitchener, Ontario, Canada. The project involved the installation of 52 cat6 cable drops in an office setting in Concord and 8 cat6 cable drops in the Kitchener warehouse. The two-man crew of highly specialized structural cabling technicians was deployed for 4 days to complete the work.
The details of the work are below:
1. Install 2 Drops for Wireless Access Points
2. Install 50 Drops for Data
5. Terminate, Test, and Certify all the drops
All 52 Cat6 cables were terminated in a patch panel in the network cabinet. 3 counts of 24 ports Cisco Meraki Switches were installed and all the connections were patched as per the instruction from the client.
The below image shows the termination of a few jacks out of 52 drops in the office and warehouse area on site. Each of these jacks was terminated and tested with a Fluke cable certifier. A pdf report was generated and submitted to the client along with a final installation of the report.
Image of a few jacks termination in office area on site.
Please get in touch with the experts at Orion US today.
Image Source: Canva